Calculator
Percolation test calculator
Enter your drop reading and interval. You get the minutes-per-inch rate, the soil class it matches, the loading rate your drainfield would be sized on, and whether a conventional field is realistic.
Percolation rate
30 min/inch
60 minutes ÷ 2 inches of drop. Suitable
Loading rate
0.5
gpd per ft²
Absorption area
720
ft² for a 3-bedroom home
Trench length
240 ft
3 × 80 ft at 3 ft wide
With reserve
1,440
ft² of protected yard
- Consistent with sandy loam at a 0.5 gpd/ft² loading rate.
- Hand-texture cross-check — sandy loam should feel like this: Gritty with some smoothness; ball holds, ribbon <1 in.
How to run a percolation test
- Dig the holes. 6 to 12 inches across, down to the proposed trench depth — usually 18 to 36 inches. Most codes require at least three holes spread across the proposed field area, not clustered in one corner.
- Scarify the sides. Digging smears the soil and seals the hole. Scratch the sides with a knife or nail and clear the loose material out of the bottom.
- Add gravel. Two inches of coarse gravel in the bottom stops the falling water from scouring a crater.
- Presoak. Keep the hole filled with water for at least 4 hours, and 24 hours in clay. This is the step amateurs skip and it is the step that matters most — unsaturated soil percolates several times faster than soil in service.
- Take timed readings. Refill to a set depth and measure the drop over a fixed interval. Repeat until two consecutive readings agree within about a sixteenth of an inch.
- Divide. Minutes ÷ inches of drop = minutes per inch.
What the number means
| Perc rate | Soil | Loading rate | What it means |
|---|---|---|---|
| Under 1 min/in | Gravel or coarse sand | — | Too fast Effluent passes through untreated. Expect a sand-lined trench or an advanced treatment unit. |
| 1–5 min/in | Coarse sand | 0.80 | Marginal Fast. Some states require a liner or extra separation. |
| 6–20 min/in | Fine sand, loamy sand | 0.60 | Excellent The easiest soil to permit and the cheapest to build in. |
| 21–30 min/in | Sandy loam | 0.50 | Good Conventional trenches, moderate field size. |
| 31–45 min/in | Loam | 0.40 | Good Workable; field roughly 25% larger than sandy loam. |
| 46–60 min/in | Silt loam | 0.30 | Fair Large field. Check whether your county still allows gravity trenches. |
| 61–120 min/in | Clay loam | 0.15–0.20 | Poor Very large field or an alternative system. |
| Over 120 min/in | Clay | — | Unsuitable Conventional trenches are not permitted. Mound, at-grade, or drip. |
Soil texture as a cross-check
A perc test measures one afternoon. A texture classification describes the soil's permanent behaviour, which is why most modern codes now prefer it. You can run the hand-texture test yourself with a handful of moist soil and compare it against your perc result — if they disagree badly, the perc test is usually the one that is wrong.
| Texture | How it feels when moist | Loading rate |
|---|---|---|
| Coarse sand / gravel | Gritty, falls apart when wet, will not hold a ribbon. | 0.8 gpd/ft² |
| Medium sand | Gritty and loose; individual grains visible. | 0.8 gpd/ft² |
| Fine sand | Gritty but softer; barely holds shape when squeezed. | 0.6 gpd/ft² |
| Loamy sand | Mostly gritty; forms a weak ball that crumbles easily. | 0.6 gpd/ft² |
| Sandy loam | Gritty with some smoothness; ball holds, ribbon <1 in. | 0.5 gpd/ft² |
| Loam | Even mix — slightly gritty, slightly smooth, slightly sticky. | 0.4 gpd/ft² |
| Silt loam | Floury and smooth when dry; ribbon under 1 inch. | 0.3 gpd/ft² |
| Sandy clay loam | Gritty but sticky; ribbons 1–2 inches before breaking. | 0.25 gpd/ft² |
| Clay loam | Sticky and plastic; ribbons 1–2 inches. | 0.2 gpd/ft² |
| Silty clay loam | Smooth and sticky; ribbons about 2 inches. | 0.15 gpd/ft² |
| Clay / silty clay | Very sticky and plastic; ribbons over 2 inches. | 0.1 gpd/ft² |
Common questions
What is a good perc rate?
Between about 10 and 45 minutes per inch is the sweet spot: fast enough to accept effluent, slow enough to treat it. Under 5 mpi the soil drains too fast to treat properly and many codes require a sand liner. Over 60 mpi you are heading toward a mound or drip system, and over 120 mpi a conventional trench field is generally not permitted.
Can I do my own perc test?
You can do one to inform your own decision — for example, before buying a lot — and it is worth doing. But no health department will accept it. The official test must be run by a licensed soil evaluator, engineer, or health department staff, usually with multiple holes, a presoak period, and witnessed readings.
Why does my result differ from the official one?
Almost always because of soil moisture and presoak. A test run on dry summer soil percolates far faster than the same hole in March. That is why codes require a presoak — often 24 hours — and why many states schedule testing for the wet season.
Has the perc test been replaced?
Increasingly, yes. Many states now prefer a soil morphology evaluation, where a soil scientist examines a pit and classifies texture, structure, and redoximorphic features to assign a loading rate directly. It is more reliable than a perc test because it reads the soil's long-term behaviour rather than one afternoon's infiltration.
My lot failed the perc test. Is it unbuildable?
Not usually. It means a conventional trench field will not work, which pushes you toward a mound, at-grade, drip, or aerobic system — more expensive, but almost always possible. The exceptions are sites with bedrock or water table too close to the surface to meet the vertical separation requirement at all.
Other calculators
Septic Tank Size Calculator
Find the minimum tank capacity your state code requires, plus the size a designer would actually specify for your household.
Drainfield Size Calculator
Calculate absorption area from your soil’s percolation rate or texture class, with trench length and mound alternatives.
Septic System Cost Calculator
Build a line-item install estimate — tank, drainfield, excavation, permits, and design — adjusted for your state.
Pumping Schedule Calculator
Work out how many years you have before sludge reaches the outlet baffle, using the EPA solids-accumulation model.
Household Water Use Estimator
Estimate the daily flow your system has to treat — the number every other septic calculation depends on.
Septic vs Sewer Comparison
Compare thirty years of owning a septic system against connecting to a public sewer, with every assumption editable.
